Valencia Multifamily Project

Jose Valencia (Applicant), with the City of Avenal (City) as Lead Agency has proposed to construct four multi-family fourplex units (Project) within the City of Avenal in the western portion of Kings County, California. The residential development would occupy approximately one acre of Accessor’s Parcel Number (APN) 040-280-018. The Project would require a General Plan Amendment (GPA) and a Zone Change (ZC). The Project would connect to the City of Avenal’s water and sewer systems. The construction of the new residential development would serve current residents of Avenal and is not expected to increase the population of the City.

The construction of fourplex units will take approximately 10 months per unit, with the complete Project to be completed in 40 months. Construction will include no more than five people onsite. Equipment that may be used during construction includes 12 CY and 20 CY scrapers, motor graders, a 500-gallon water truck, a small excavator/tractor, a rubber-tired compactor, 12 CY concrete trucks, and a concrete extrusion machine.

The document and documents referenced in the Initial Study/Mitigated Negative Declaration are available for review at Avenal City Hall located at 919 Skyline Boulevard, Avenal, CA 93204, and is provided in the link below. You may also find the Notice of Public Hearing and Intent to Adopt a Mitigated Negative Declaration below.